SWITCH 5
Switchback 5 looking west southwest. Note all the rails along the side of the track. Albeit the date is unknown on this picture the track material could be for the tunnel or completion of the switchback above. The steam in the background is from the boiler that powers the compressor for the air drills used in the tunnel construction.